<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Crezza</title>
	<atom:link href="https://www.crezza.com/en/feed/" rel="self" type="application/rss+xml" />
	<link>https://www.crezza.com/en/home-en/</link>
	<description>Just another WordPress site</description>
	<lastBuildDate>Wed, 23 Sep 2026 12:59:32 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=6.9.9</generator>

<image>
	<url>https://www.crezza.com/wp-content/uploads/2023/12/favicon_crezza-150x150.png</url>
	<title>Crezza</title>
	<link>https://www.crezza.com/en/home-en/</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Crezza at Asphaltica 2026: a look at sustainable prefabrication at the fair.</title>
		<link>https://www.crezza.com/en/crezza-at-asphaltica-2026-a-look-at-sustainable-prefabrication-at-the-fair/</link>
		
		<dc:creator><![CDATA[crezza]]></dc:creator>
		<pubDate>Wed, 23 Sep 2026 12:59:32 +0000</pubDate>
				<category><![CDATA[Senza categoria]]></category>
		<guid isPermaLink="false">https://www.crezza.com/?p=2636</guid>

					<description><![CDATA[<p>From 7 to 10 October 2026, Crezza will be at BolognaFiere for Asphaltica 2026, the international exhibition dedicated to infrastructure and road safety. An event where Crezza will showcase its innovation in concrete prefabrication, developed through collaboration with specialized partners in the supply chain and translated into concrete production solutions. Between its booth and in-depth [&#8230;]</p>
<p>L'articolo <a href="https://www.crezza.com/en/crezza-at-asphaltica-2026-a-look-at-sustainable-prefabrication-at-the-fair/">Crezza at Asphaltica 2026: a look at sustainable prefabrication at the fair.</a> proviene da <a href="https://www.crezza.com/en/home-en/">Crezza</a>.</p>
]]></description>
										<content:encoded><![CDATA[<p>From <strong>7 to 10 October 2026</strong>, Crezza will be at <strong>BolognaFiere</strong> for <strong>Asphaltica 2026</strong>, the international exhibition dedicated to infrastructure and road safety.</p>
<p>An event where Crezza will showcase its innovation in concrete prefabrication, developed through collaboration with specialized partners in the supply chain and translated into concrete production solutions. Between its booth and in-depth workshop, three key areas will be at the heart of this event: materials with a reduced carbon footprint, new product features, and greater energy efficiency.</p>
<p>A journey that also enhances valuable collaborations: together with Heidelberg Materials Italia and Cav. Vittorio Scipioni, Pureti&#8217;s Italian distributor, Crezza will present experiences and tangible results gained along the path of developing solutions for road infrastructure.</p>
<p>The process also involves efficiency improvements at the Crezza di Gordona plant, where photovoltaic production has led the main plant to achieve a level of 70% energy self-sufficiency.</p>
<p>The central event will be the workshop &#8220;Sustainability in prefabrication: leveraging skills and networking to develop concrete products with materials with a reduced carbon footprint and features aimed at improving air quality,&#8221; scheduled for Friday, October 9, at 10:00 a.m., in Conference Room 3, Pavilion 37 of BolognaFiere.</p>
<p>A three-way discussion with <strong>Crezza, Heidelberg Materials Italia</strong> and <strong>Pureti</strong> to discuss how materials, technologies and skills can be integrated to make the sustainable transition in the world of infrastructure more concrete and measurable.</p>
<p class="western"><strong>We look forward to seeing you at Asphaltica 2026.</strong></p>
<p>L'articolo <a href="https://www.crezza.com/en/crezza-at-asphaltica-2026-a-look-at-sustainable-prefabrication-at-the-fair/">Crezza at Asphaltica 2026: a look at sustainable prefabrication at the fair.</a> proviene da <a href="https://www.crezza.com/en/home-en/">Crezza</a>.</p>
]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Precast arches and metal reinforcements for tunnel safety</title>
		<link>https://www.crezza.com/en/precast-arches-and-metal-reinforcements-for-tunnel-safety/</link>
		
		<dc:creator><![CDATA[admin]]></dc:creator>
		<pubDate>Mon, 07 Oct 2024 13:02:04 +0000</pubDate>
				<category><![CDATA[News]]></category>
		<guid isPermaLink="false">https://www.crezza.com/?p=2155</guid>

					<description><![CDATA[<p>Innovative construction solutions for tunnel safety systems &#160; Crezza, a company specialized in concrete prefabrication, which has been working since 1992 in Italy and abroad on works of national importance, has recently been a protagonist of several motorway infrastructure projects that have brought out the ability to find tailor-made solutions and the more innovative side [&#8230;]</p>
<p>L'articolo <a href="https://www.crezza.com/en/precast-arches-and-metal-reinforcements-for-tunnel-safety/">Precast arches and metal reinforcements for tunnel safety</a> proviene da <a href="https://www.crezza.com/en/home-en/">Crezza</a>.</p>
]]></description>
										<content:encoded><![CDATA[<h2>Innovative construction solutions for tunnel safety systems</h2>
<p>&nbsp;</p>
<p>Crezza, a company specialized in <strong>concrete prefabrication</strong>, which has been working since 1992 in Italy and abroad on works of national importance, has recently been a protagonist of several <strong>motorway infrastructure projects</strong> that have brought out the ability to find <strong>tailor-made solutions</strong> and the more innovative side of the Valchiavenna reality.</p>
<p>&nbsp;</p>
<h3>New precast solutions for renovation of road tunnels</h3>
<p><strong>Tunnel safety</strong> is a cornerstone in the tunneling sector, and for this purpose, Autostrade per l&#8217;Italia has made itself the committer of numerous <strong>renovation and redevelopment interventions for motorway tunnels</strong> throughout the peninsula, assigning to specialists and leading national companies &#8211; including Crezza &#8211; for the respective maintenance lots. <strong>The structural renovation of old construction tunnels</strong> has required the study of customized solutions to adapt to the existing structures and meet the <strong>durability needs</strong> demanded by the client.</p>
<p><strong>Crezza</strong> has responded to these specific requirements by leveraging its <strong>technological know-how and the experience</strong> gained over decades of motorway projects. The outcome was twofold:</p>
<ul>
<li>The development, design, and installation of <strong>new tunnel linings consisting of a precast concrete arch </strong>made up of three elements – two piers and a cap – resting on a newly rebuilt low wall;</li>
</ul>
<p>&nbsp;</p>
<ul>
<li>The realization of a <strong>metallic armour-plate for motorway tunnels</strong> to provide a tunnel lining with the thinnest possible thickness, aimed at reducing the depth of milling of the original linings.</li>
</ul>
<p>&nbsp;</p>
<h3>Structural Renewal of Del Fico Tunnel and San Bernardo Tunnel on the A12 Motorway</h3>
<p>The technical solutions conceived and developed by Crezza were carried out in the framework of two infrastructure <strong>renovation projects</strong> on Ligurian motorways, specifically for <strong>two tunnels on the A12</strong> stretch between Genoa and Sestri Levante: the Del Fico Tunnel and the San Bernardo Tunnel.</p>
<p><strong>The Del Fico Tunnel</strong>, built in the 1960s and 240 meters long, featured two artificial sections at the entrances and a natural central section, and it required the <strong>structural renovation </strong>of the tunnel&#8217;s caps,  low walls, and piers, with the realisation of new lighting systems, waterproofing systems, drainage systems, and new paving. The maintenance intervention involved an initial phase of <strong>milling the original linings</strong> for partial demolition, followed by the installation of <strong>precast special</strong> <strong>lattice segments</strong> in a wedge shape: 100 concrete elements, each composed of two piers and a cap, to form <strong>a precast arch for the tunnel&#8217;s new lining</strong>. The components were prefabricated by Crezza and then installed directly on-site by the same company with remarkable speed, despite the reduced milling thickness.</p>
<p><strong> </strong><strong> <img fetchpriority="high" decoding="async" class="alignnone wp-image-1812 " src="https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-3.jpeg" alt="posa conci prefabbricati in galleria in Liguria (A12)" width="598" height="798" srcset="https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-3.jpeg 1200w, https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-3-225x300.jpeg 225w, https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-3-768x1024.jpeg 768w, https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-3-1152x1536.jpeg 1152w" sizes="(max-width: 598px) 100vw, 598px" /></strong></p>
<p><strong> </strong></p>
<p><strong>The San Bernardo Tunnel</strong>, located on the same stretch of the Ligurian motorway, is shorter (91.75 meters) and underwent a structural <strong>renovation and secured</strong>, which also included waterproofing and water drainage. In this case, Crezza’s experts opted not for precast segments but for the <strong>construction of a metallic armour-plate </strong>to offer a more durable and high-performing solution to the stress factors associated with the excavation section, without forgetting the availability of small milling spaces. Crezza, in collaboration with its partners in the Temporary Association of Companies (ATI), built a <strong>galvanized metal</strong> <strong>framework </strong>consisting of curved metal beams, sheets, and fixings, which was then installed directly on-site.</p>
<p><img decoding="async" class="alignnone wp-image-1813 " src="https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-1.jpeg" alt="opere di blindaggio metallico in galleria sulla A12 in liguria" width="609" height="457" srcset="https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-1.jpeg 2040w, https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-1-300x225.jpeg 300w, https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-1-1024x768.jpeg 1024w, https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-1-768x576.jpeg 768w, https://www.crezza.com/wp-content/uploads/2024/05/a12-galleria-fico-san-bernardo-blindaggio-1-1536x1152.jpeg 1536w" sizes="(max-width: 609px) 100vw, 609px" /></p>
<p>&nbsp;</p>
<p>Discover more details about the two motorway tunnel projects on the A12 carried out by Crezza.</p>
<p>L'articolo <a href="https://www.crezza.com/en/precast-arches-and-metal-reinforcements-for-tunnel-safety/">Precast arches and metal reinforcements for tunnel safety</a> proviene da <a href="https://www.crezza.com/en/home-en/">Crezza</a>.</p>
]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
